Italy's Ministry of Enterprises and Made in Italy incentive is back for anyone installing a wallbox or charging station at home or in the common areas of a condominium building. Here's what it covers, who can apply, and how to get ready before applications open.

22.09

Applications open on Tuesday, September 22, 2026 at 12:00 (noon) on the Invitalia platform, and remain open until January 31, 2027, unless funds run out earlier.

What it is

The Home Charging Point Bonus is managed by Invitalia on behalf of the Ministry (Mimit) and makes a total of €68 million available through 2030. It's aimed at private individuals resident in Italy and at condominiums that want to install an electric vehicle charging point, either in a private home or in a building's common areas.

The decree governing the measure is dated August 4, 2026, and explicitly ties the incentive to supporting Italian manufacturing: more than half of the next-generation charging infrastructure installed in the country is produced domestically.

Amounts and caps

Coverage80% of eligible costs, VAT included
Individualsup to €1,500 per application
Condominiumsup to €8,000 for work on common areas
Total funding€68 million, allocated by year through 2030
Type of aidnon-repayable grant, paid as a capital contribution

What eligible costs include

Besides the purchase and installation of the charging point or wallbox, the grant also covers charge monitoring and management systems (even if installed separately), grid connection devices, design, site supervision, safety checks and testing. Activation of a new dedicated POD (grid connection point) is also included, if needed.

Installation time windows

The grant follows the works calendar, not just the application calendar: for each year, only spending on infrastructure installed within specific periods is eligible.

  • 2026: installations completed between June 26 and December 31
  • 2027–2029: the full calendar year, January 1 – December 31
  • 2030: installations completed by March 31

How to apply

  1. Authentication — access the Invitalia platform via SPID, CIE or CNS (Italian digital identity systems).
  2. Filling out the application — a guided online form, with details of the work and costs incurred or planned.
  3. Proof of payment — payments must be traceable and the equipment must be brand new; condominiums also need the assembly resolution and the breakdown of shared costs.
  4. Submission within the deadline — window from September 22, 2026 to January 31, 2027, with the possibility of early closure if funds run out sooner.

The connection with solar power

If you already have a solar (photovoltaic) system, or are considering installing one, you can pair the charging point with your home's own production: charging your electric car during the day increases self-consumption and shortens the payback time on your solar investment.

The reverse also works: installing the charging point first leaves the electrical connection ready for a future solar system, avoiding having to redo work on the panel and grid connection twice. Conquisun handles both paths — charging point installation and solar systems — and can help you plan the work and the Invitalia application. Request a free consultation.

Data updated as of September 15–16, 2026, based on communications from Mimit and Invitalia. The decree governing the measure is dated August 4, 2026. For the application and detailed requirements, the official reference remains the Invitalia platform.